New construction Zandbergen Beyond Meat
In 2020, the new construction of Zandbergen World's Finest production site in Zoeterwoude (Beyond Meat) was completed. For this beautiful BREEAM project, Ruys Vloeren supplied a total of 4,200 m2 of wear-resistant MARGIA GRANITE floors with matching hollow coves.
Zandbergen World's Finest Meat, headquartered in Zoeterwoude, is a leading company in the international protein supply chain. They import and supply chilled and frozen meat all over the world. They also produce portioned steaks and burgers and a wide range of pre-cut products.
The building of Zanbergen World's Finest Meat consists of different spaces, each of which is used in a different way. As a result, there was absolutely no 'one size fits all' approach possible. Therefore, the specific requirements of each space were first mapped out. The result was a custom solution, in which aspects such as the hardness of the floor and safety in the form of anti-slip were perfectly matched to the use.